Chicago - Collocation Facility


Global Crossing
101 North Wacker Drive
Chicago, Illinois

Taylor Leigh Construction converted a decommissioned Switch Room into a new 1,500 sq. ft. Collocation Facility located in downtown Chicago. Taylor Leigh Construction installed and commissioned a Powerware® 9315-225kVA Uninterruptible Power System, external battery cabinets, maintenance bypass panel in addition to new electrical distribution system, lighting, fabrication and installation new building steel to support the UPS, modifications to the existing air distribution system for high density server application, cable & fiber management systems, equipment cabinets, woven wire partitions with access control system.