Denver - Site Decommission
Global Crossing
950 17th Street, 9th Floor
Denver, Colorado
Taylor Leigh Construction prepared demolition documentation for permit consisting of drawings and specifications
setting forth in detail the requirements to remove all interior components of a 3,000 sq. ft. data center in downtown
Denver. The work required Taylor Leigh Construction to remove and dispose of all interior wall partitions, acoustical
ceilings, curtain walls, flooring, ceilings, doors, light fixtures, wall coverings, window treatments, electrical
distribution equipment & devices, mechanical equipment & associated ductwork, fire suppression equipment &
piping, telecom equipment, cable & fiber management systems.